CHAPTER 102 EROSION AND SEDIMENT CONTROL

PERMIT APPLICATIONS

 

All earth disturbance activities equal to or greater than 5,000 square feet are required to have a written Erosion & Sediment Control Plan. If earth disturbance is equal to or greater than 1 acre, a permit must be obtained from either the Conservation District or the DEP.

 

DEP E&S Resources: https://www.dep.pa.gov/Business/Water/CleanWater/StormwaterMgmt/Stormwater%20Construction/Pages/E-S%20Resources.aspx

 

DEP Construction Stormwater:  https://www.dep.pa.gov/Business/Water/CleanWater/StormwaterMgmt/Stormwater%20Construction/Pages/

default.aspx

 

NPDES General Permit Application NOI: http://www.depgreenport.state.pa.us/elibrary/GetFolder?FolderID=90982

 

Individual NPDES Permit Application: Requires review coordination with DEP http://www.depgreenport.state.pa.us/elibrary/GetFolder?FolderID=105622

ESCGP-3 NOIhttp://www.depgreenport.state.pa.us/elibrary/GetFolder?FolderID=43107

 

Chapter 102 Permit Modules: http://www.depgreenport.state.pa.us/elibrary/GetFolder?FolderID=105480

Timber Harvest Plan Template: http://www.depgreenport.state.pa.us/elibrary/GetFolder?FolderID=33505

Other Useful Forms: Includes Liability Release forms, Co-Permittee Acknowledgement forms, County and Municipality Notification forms, Visual Site Inspection forms, and Pre-application Meeting Request forms. http://www.depgreenport.state.pa.us/elibrary/GetFolder?FolderID=2713

Notice of Termination Forms: http://www.depgreenport.state.pa.us/elibrary/GetFolder?FolderID=3668

CHAPTER 105 WATER OBSTRUCTIONS AND ENCROACHMENTS

PERMIT APPLICATIONS

A Chapter 105 General Permit is required for work done in wetlands or crossing or encroaching upon a stream, river, or other waterway. This includes, but is not limited to, bank stabilization projects, sand/gravel bar removal, and creation of fish habitat by landowners.

 

Please use the link below to learn about General Permit categories and determine which type(s) of GP your project will require. Permit fees are determined by GP type and E&S requirements are based on the Chapter 93 Designated Water Use of the waterway or wetland.

Chapter 105 General Permit Applications: http://www.depgreenport.state.pa.us/elibrary/GetFolder?FolderID=4050

 

Chapter 93 Designated Water Uses Watersheds Map: https://www.spcregion.org/water/pdf/maps/Chap93DesignatedUses.pdf